Bauzeitenplaner.de - SEO Checker

Overview of the SEO Check
Meta information
78% 
Page quality
30% 
Page structure
79% 
Link structure
97% 
Server
45% 
External factors
65% 
SEO Score
Response time
0.15 s
File size
17.10 kB
Words
311
Media files
33
Number of links
23 internal / 8 external

Task list of SEO Improvements

Meta specifications

Title
(Critically important)
Bau-Projekt-Management
The page title is only one word.
There are no duplicate words in the title
Meta description
(Critically important)
Thema: BauProjektManagement. Mit ► Marktübersicht Bauzeitenplanung-Software ► Bauzeitenplaner - Anwenderberichte, ► Fachliteratur ...
The length of the meta description is perfect. (881 pixels out of 1000 max pixel length)
Crawlability
(Critically important)
There are no problems in accessing the website.
Canonical URL
(Important)
No canonical link is specified.
Language
(Somewhat important)
Language detected in text: de
Server location: Germany
One or more of the specified languages are not ISO standard (en, en-us, de, etc.)
The language is not specified in the HTML markup.
Alternate/Hreflang Links
(Somewhat important)
There are no alternate links specified on this page.
Other meta tags
(Somewhat important)
There is no rel next meta tag on this page.
There is no rel prev meta tag on this page.
Domain
(Somewhat important)
The domain name is very long.
The domain is no subdomain.
The domain does not contain non-latin characters.
Page URL
(Somewhat important)
No parameters were found in the URL.
No session ID was found in the URL.
The URL does not have too many subdirectories.
Charset encoding
(Somewhat important)
HTTP-Header Content-Type: utf-8
Meta http-equiv Content-Type: iso-8859-1
The specified character encodings are different.
Doctype
(Nice to have)
No doctype markup was found.
Favicon
(Nice to have)
No favicon is linked in the HTML code.

Meta tags

NameValue
google-site-verificationU3ugTthkycx84u6hsqQzz91MepSfFE0yqo-iDmjoKL4
content-languagede
keywordsBau-Projekt-Management, Bauzeiten-Planung, Bauablaufplanung, Ressourcenplanung, Bau-Terminplane, Software Programme
descriptionThema: BauProjektManagement. Mit ► Marktübersicht Bauzeitenplanung-Software ► Bauzeitenplaner - Anwenderberichte, ► Fachliteratur ...
abstractThema: Bau-Projektmanagement. Mit ► Marktübersicht Bauzeitenplanung-Software ► Bauzeitenplaner - Anwenderberichte, ► Fachliteratur ...
page-topicBau-Projekt-Management
page-typeEmpty
audienceEmpty
publisherEmpty
revisit-after2 days
robotsindex, follow
ROBOTSNOODP
authortm
content-typetext/html; charset=iso-8859-1

Test up to 1.000 webpages of bauzeitenplaner.de with our free plan!

Sign Up Free
No trial. It's just free!

Page quality

Content
(Critically important)
Only 2 paragraph/s was/were found on this page.
There are only 311 words on this page. Good pages should have about 1,000 words of useful content.
13.8% of the text are stop words.
No placeholders texts or images were found.
There are no duplicates on the site.
The average number of words per sentence of 12.75 words is good.
Frames
(Critically important)
This website does not use a frameset.
Mobile optimization
(Somewhat important)
No viewpoint tag is provided.
No Apple touch icon is specified.
This website only loads 2 JavaScript files. That's good!
Bold and strong tags
(Somewhat important)
Some tags are too long. With 334 characters this one is longer than 70 characters:
"► startseite ► marktübersicht pm projektmanagement software bauwesen bauzeitenplanung ► zeit-wege-plan..."
Image SEO
(Somewhat important)
33 images have no alt attribute. The content of alt attributes is used by search engines.
Social Networks
(Nice to have)
There are only a few social sharing widgets on the page. Make your website popular in social networks with social sharing widgets.
Additional markup
(Nice to have)
No additional page markup was found.
HTTPS
(Somewhat important)
The HTTPS protocol for secure data transmission is not used.

Media list

URLAlt attributeTitle
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/pp04xs.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/bst01sxf.jpgNo alt attribute provided
/img/link-i.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-x.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-x.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-x.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided
/img/link-x.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
/img/link-i.gifNo alt attribute provided
http://www.bauzeitenplaner.de/img/pixel.gifNo alt attribute provided

Page structure

H1 heading
(Critically important)
There is no H1 heading specified.
Headings
(Important)
The structure of headings is missing one or more levels. Do not skip heading levels.

Heading structure

Heading levelContent
H2 bauzeitenplaner.de Projektmanagement im Bauwesen
H3 Bau-Projektmanagement: Software, Praxis, Fachliteratur ...
H3 Projektmanagement: Software Marktübersichten, News, Fachbücher
1 links don't have an anchor text.
The amount of internal links is ok.
Every linktext is unique.
None of the anchor texts is too long.
All internal links don't have dynamic parameters.
There are 8 external links on this page.
LinkAttributesAnchor text
/sitemap.phpNo Text
/bauzeitenplanung-software.phpMarktübersicht PM Projektmanagement Software Bauwesen Bauzeitenplanung
A-TITLE Bau-Projektmanagement, Bauablaufplanung: Software-Lösungen
/zeit-wege-planung.phpZeit-Wege-Planung
A-TITLE Projektmanagement-Software für Linienbaustellen mit Zeit-Wege-Diagrammen
/ibpm-bau-projektraum.phpIBPM, PKS, PKM, Bau-Projektraum
A-TITLE IBPM, PKS, PKM, online Bau-Projektraum, internet-basiertes Bau-Projekt-Management
/anwenderberichte-bau-projekt-...Anwenderberichte Baumanagement
A-TITLE Anwenderberichte über Projekt-Management-Software im Bauwesen
/bauzeitenplanung-fachliteratu...Fachliteratur Bauzeitenplanung, Projektmanagement
A-TITLE Literatur zu Bau-Projekt-Management, Bauablaufplanung, Baumanagement
http://www.aec-office.de/hoai/...New window External HOAI Software, Honorarrechner, Apps
A-TITLE Marktübersicht HOAI Programme, Honorarrechner, Apps: Honorarermittlung, Honorarkalkulation, Honorarabrechnung nach HOAI
http://www.aec-office.de/bmsp_...New window External Controlling- u. Bürosoftware für Planer
A-TITLE Marktübersicht BMSP: Controlling- und Bürosoftware für Architekturbüros, Ingenieurbüros
http://www.ava-bau.info/ava-so...New window External Subdomain AVA Software Marktübersicht
A-TITLE AVA Software Programme, AVA Tools
/bauzeitenplanung-software.phpMarktübersicht Bau-Projektmanagement-Software
/_bauzeitenplan.phpBauzeitenplan
/_bauablaufplan.phpBauablaufplan
/_bauzeitenplan.phpBauzeitplan
/bauzeitenplanung-software.phpSoftware-Übersicht Bauzeitenplanung
/pdf/ASTA_pi_2012-09_V12_txt.pdfNew window Projekt-Power für Profis: Asta Powerproject Version 12 ist da [pdf]
http://www.vob-2012.info/New window External Subdomain Neue VOB 2012
/pdf/ASTA_pi-2011-11_DEUBAU.pdfNew window DEUBAU 2012 - Asta Powerproject: Projektmanagement jetzt auch mobil [pdf]
/pdf/ASTA_pi-2011-09_projectbr...New window Asta Project Browser bringt Powerproject-Daten ins Netz [pdf]
/anwenderberichte-bau-projekt-...Anwenderberichte Projektmanagementsoftware / Baumanagement
/pdf/ASTA_pi_2010-11_V11.pdfNew window Asta Powerproject Version 11: Projekt-Power für Profis [pdf]
http://www.aec-office.de/bmsp_...New window External BMSP (Internes Controlling, Bürosoftware)
/pdf/ASTA_pi_2010-04_4D.pdfNew window Asta 4D und Asta Baucontrol [pdf]
/pdf/pi_asta_0912_auftragspl.pdfNew window ASTA Powerproject mit Auftragsplanung [pdf]
http://www.vob-2009.info/New window External Subdomain Neue VOB 2009
/pdf/linear_project_pi-2009-10...New window Das Zeit-Wege-System TILOS beherrscht jetzt auch Balkenpläne [pdf]
/pdf/pi_asta_0910_doku.pdfNew window ASTA Powerproject - Projektplanung und Dokumentenmanagement verknüpfen [pdf]
http://www.hoai-2009.info/New window External Subdomain Neue HOAI 2009
/pdf/pi_linear_project_0903.pdfNew window Konzentration auf Linienbaustellen mit TILOS [pdf]
/pdf/pi_asta_0902_eleco_aec.pdfNew window ASTA Powerproject - Kurzer Draht zum Hersteller [pdf]
/impressum.phpImpressum
http://www.kommazwo.com/External © Komma Zwo

Server configuration

HTTP redirects
(Critically important)
The checked page does not redirect to another URL.
HTTP header
(Important)
The used PHP version is outdated and may be a security risk.
The X-powered header is sent within the response header. (unnecessary)
This website uses GZip for compressed data transmission.
Performance
(Somewhat important)
The page response time is excellent with 0.15 seconds.
This website does not require any CSS files.
This website only loads 2 JavaScript files. That's good!
The file size of the HTML document is fine (17 kB).

HTTP Response Header

NameValue
dateTue, 04 Feb 2020 05:16:12 GMT
serverApache
x-powered-byPHP/5.6.11-1ubuntu3.4
varyAccept-Encoding
content-encodinggzip
connectionclose
transfer-encodingchunked
content-typetext/html; charset=UTF-8
statuscode200
http_versionHTTP/1.1

External factors

Blacklists
(Critically important)
This website is not classified "for adult only".
This website is not listed on the Shallalist.
This website has only a few links from other websites.
This website only has backlinks from 17 referring domains.
This website only has 47,083 backlinks.
This website only has few backlinks from 11 different ip addresses.
Facebook popularity
(Somewhat important)
This website is not very popular on facebook.
Listed on Webwiki
(Nice to have)
This website is listed on Webwiki.

Links from Wikipedia

No links from Wikipedia were found.

Robots.txt

User-agent: *
Disallow: /cgi-bin/
Disallow: /img/
Disallow: /go.php
Disallow: /x-go.php

User-agent: Mediapartners-Google*
Disallow:

Sitemap: http://www.bauzeitenplaner.de/sitemap.txt

Facebook popularity

Shares / Likes / Comments
0

Only the data for the given URL is shown. We cannot determine the social actions for a linked fan page.

Search preview

www.bauzeitenplaner.de
Bau-Projekt-Management
Thema: BauProjektManagement. Mit ► Marktübersicht Bauzeitenplanung-Software ► Bauzeitenplaner - Anwenderberichte, ► Fachliteratur ...

Most important keywords

Seobility found the following keywords. You can check the keyword optimization of this page for each keyword.

KeywordResultRecheck
Planer59%Check
Bauzeitenplan59%Check
Management Software57%Check
bauzeitenplaner54%Check
Projektmanagement Software50%Check
Software50%Check
Fachliteratur45%Check
Marktübersicht45%Check
Anwenderberichte40%Check
AVA Software40%Check

Test up to 1.000 webpages of bauzeitenplaner.de with our free plan!

Sign Up Free
No trial. It's just free!