Bevor die Bäume gefällt werden können, müssen wir von der jeweiligen Stadt eine Genehmigung zur Baumfällung einholen. Dieser Prozess nimmt ungefähr 2 Wochen in Anspruch.
H5
Haben Sie Fragen? Wir sind für Sie da.
Link structure 81% achieved
Internal links
(Important)
Some anchor texts are used more than once.
The number of internal links is ok.
None of the anchor texts is too long.
All internal links are not using dynamic parameters.
The page response time of 0.99 seconds is longer than the recommended limit of 0.4 seconds. A high response time unnecessarily slows down search engine crawling and results in bad user experience as well.
The file size of the HTML document is fine (180 kB).
Please select one of the following options for your request.
Contact us!
Thanks for your message!
We have received your message and will process it as soon as possible.
Cookie Policy
We use cookies to make our site work and also for analytics and advertising purposes. You can enable or disable optional cookies as desired. See the following links for more information.
(Nice to have)