Neccontract.com - SEO Checker

Overview of the SEO Check
Meta information
80% 
Page quality
88% 
Page structure
45% 
Link structure
67% 
Server
100% 
External factors
100% 
SEO Score
Response time
0.15 s
File size
132.80 kB
Words
647
Media files
41
Number of links
90 internal / 4 external

Task list of SEO Improvements

Meta specifications

Title
(Critically important)
Contracts, Project Management and Procurement | NEC Contracts
The page title should be shorter than 580 pixels. It is 597 pixels long. Optimize title
There are no duplicate words in the title
Meta description
(Critically important)
A family of contracts that facilitates the implementation of sound procurement and project management principles and practices as well as defining legal relationships.
The meta description is too long: 1020 pixels from max. 1000 pixels. Optimize description
Crawlability
(Critically important)
There are no problems in accessing the website.
Canonical URL
(Important)
https://www.neccontract.com/
There is a valid canonical link specified.
Language
(Somewhat important)
Language detected in text: en
Server location: United States of America
The language is not specified in the HTML markup.
Alternate/Hreflang Links
(Somewhat important)
There are no alternate links specified on this page.
Other meta tags
(Somewhat important)
There is no rel next meta tag on this page.
There is no rel prev meta tag on this page.
Domain
(Somewhat important)
The domain is no subdomain.
The domain length is good.
The domain does not contain non-latin characters.
Page URL
(Somewhat important)
No parameters were found in the URL.
No session ID was found in the URL.
The URL does not have too many subdirectories.
Charset encoding
(Somewhat important)
The charset encoding (UTF-8) is set correctly.
Doctype
(Nice to have)
The doctype HTML 5 is set correctly.
The doctype is placed at first in the HTML code.
Favicon
(Nice to have)
The favicon is linked correctly.

Meta tags

NameValue
viewportwidth=device-width, initial-scale=1.0
descriptionA family of contracts that facilitates the implementation of sound procurement and project management principles and practices as well as defining legal relationships.
keywordsnec, nec3, nec4, nec contracts, contracts, project management, pma, project manager accreditation, procurement, ecc, engineering and construction
msapplication-TileColor#da532c
theme-color#003764
X-UA-CompatibleIE=edge
charsetUTF-8

Test up to 1.000 webpages of neccontract.com with our free plan!

Try For Free
No trial. It's just free!

Page quality

Content
(Critically important)
This page contains 647 words. That's ok.
24.7% of the text are stop words.
Keywords used in the page title are also used in the page content. That's good!
Words from the H1 heading are used in the page content.
The page contains a listing, which indicates a good text layout.
8 paragraphs were found on this page.
The text content is perfect.
No placeholders texts or images were found.
There are no duplicates on the site.
The average number of words per sentence of 13.6 words is good.
Frames
(Critically important)
This page does not use a frameset.
Mobile optimization
(Somewhat important)
A viewport "width=device-width, initial-scale=1.0" is provided.
At least one Apple touch icon is specified.
Bold and strong tags
(Somewhat important)
The amount of tags is very high (22). We recommend using a maximum of 13 tags for this page.
The following tag is repeated too often: featured
Image SEO
(Somewhat important)
Alt text (alternative text) is correctly used on all found images.
Social Networks
(Nice to have)
There are only a few social sharing widgets on the page. Make your website popular in social networks with social sharing widgets.
Additional markup
(Nice to have)
No additional page markup was found.
HTTPS
(Somewhat important)
This website uses HTTPS to protect privacy and integrity of the exchanged data.
All included files are also transferred via HTTPS.

Media list

URLAlt attributeTitle
...7-bd7c-c5a029d6afbe/globe.png?width=1900Mosaic of images showing common sectors for NEC Contracts
...ab84-5c16b81de11b/network.png?width=1900Project Manager
...7-bd7c-c5a029d6afbe/globe.png?width=1900Man shaking hands
...5b-40d3-a685-9044b8c31fc2/logo-white.pngNEC logo
...015cab6/nec4-boxshot-front.jpg?width=360The latest suite of NEC Contracts enable any project to be delivered on time, within budget and to the highest standards.
...974c-4960ea43708f/NEC4-ALC.jpg?width=360The NEC4 Alliance Contract is a multiparty contract for the appointment of a number of partners to create an alliance to deliver a major project or programme of work.
...9584-70f75222de24/NEC4-ECC.jpg?width=360This bundle contains everything you need to prepare, tender and manage an NEC4 Engineering and Construction Contract (ECC) and its associated NEC4 Engineering and Construction Subcontracts (ECS).
...a14c461f05/Front-cover-FMC.jpg?width=360The NEC4 Facilities Management Contract (FMC) is intended to be used for the appointment of a service provider for a period of time to manage and provide a facility management service.
...7-7678986833b5/Study-Group.jpg?width=800Latest News
...3/Question-at-a-conference.jpg?width=800Events
...0-4718-84ad-e932bf3963a4/projects-bg.jpgProject building
...e-82ec-5a7ea4ddc04f/wits1.jpg?width=1170Wits University frameworks, South Africa
...-cbee2825c901/nottingham1.jpg?width=1170Nottingham Central Library, UK
...898d-2170ea5af292/pakwo01.jpg?width=1170North District Community Health Centre, Sheung Shui, Hong Kong
...4d0a-b558-f5a9bbf58f02/ECS.jpg?width=320Logo
...8f5c-aabd7349ac3a/heathrow.jpg?width=320Logo
...a094647a8/highways-england.jpg?width=320Logo
...65-dfca2689969b/parliament.jpg?width=320Logo
...0303b7/logo-Pinsent-masons.jpg?width=320Logo
...qua_Dark-Blue_RGB-High-Res.jpg?width=320Logo
.../ART-14-04-22-JW-Mace_CMYK.png?width=320Logo
...m-logo-open-graph-1200x630.png?width=320Logo
...olour-w-Exclusion-Area-VHQ.JPG?width=320Logo
...c5-605a73503175/CIC-logo_1.jpg?width=320Logo
...df0-8716-1a3fd74fc562/ARUP.png?width=320Logo
...ad5-23e36d7768df/ferrovial.jpg?width=320Logo
...-a4ea-75cca07833af/Balfour.jpg?width=320Logo
...464c-8bab-1ce2fc050c0e/RLB.jpg?width=320Logo
...b-b962-550d7cae83fa/Pangea.png?width=320Logo
...c7c-b2a3-b697772559ce/Kier.jpg?width=320Logo
...8c9f-2747c1bffd2f/EDF-logo.jpg?width=320Logo
...c-904f3cd4029b/Magnox-logo.jpg?width=320Logo
...Meridian_FC_5cm_RGB250x296.jpg?width=320Logo
...4da3-9f70-74f44c192631/nda.jpg?width=320Logo
...2d6e/Transport-for-London1.jpg?width=320Logo
...11a26fcfd552/Wilmott-Dixon.jpg?width=320Logo
...c32-b6d0-f7b3eac73335/2012.png?width=320Logo
...0c-7172c38bb700/interfleet.png?width=320Logo
...-fef8b9d5a560/Kingston-Uni.png?width=320Logo
...3431046/galliford-try-logo.jpg?width=320Logo
...ients-Group-Auckland-Event.jpg?width=320Logo

Page structure

H1 heading
(Critically important)
NEC Contracts
Too many H1 headings
The H1 heading is too short (13 characters). It should be at least 20 Characters long.
Headings
(Important)
The structure of headings is missing one or more levels. Do not skip heading levels.

Heading structure

Heading levelContent
H1 NEC Contracts
H1 NEC Training
H1 NEC Contracts Community App
H2 Featured Contracts
H2 Popular links
H2 Latest News
H2 Events
H2 Featured Projects
H2 Resources
H4 Wits University frameworks, South Africa
H4 Nottingham Central Library, UK
H4 North District Community Health Centre, Sheung Shui, Hong Kong
Some internal link anchor texts are too long.
Some internal links have dynamic parameters. All internal URLs, which are not marked as nofollow, should not contain dynamic parameters.
Some anchor texts are used more than once.
There are 4 links with a trivial anchor text.
The number of internal links is ok.
There are 4 external links on this page.
LinkAttributesAnchor text
https://www.neccontract.com/Anchor Skip to content
/log-inSign in/Register
https://www.neccontract.com/No Text
/log-inText duplicate Sign in/Register
/why-choose-nec/how-nec-can-helpHow NEC can help
/why-choose-nec/historyHistory
/why-choose-nec/why-is-the-nec...Why is the NEC needed?
/why-choose-nec/nec-risk-alloc...NEC Risk Allocation
/why-choose-nec/which-nec4-con...Which NEC4 Contract?
/why-choose-nec/who-we-work-wi...Testimonials
/why-choose-nec/who-we-work-wi...Partnerships
/why-choose-nec/who-we-work-wi...Endorsements
/why-choose-nec/who-we-work-wi...Add a testimonial Have you used NEC for a recent project? Add your testimonial to our site
/products/contractsContracts
/products/corporate-solutionsCorporate packages
/why-choose-nec/which-nec4-con...Choosing the right contract
/products/trainingCourses
/products/corporate-solutionsCorporate training
/products/get-accreditedGet accredited
/competency-frameworkCompetency Framework
/products/users-groupIntroduction to NEC Users' Group
/products/users-group/individualIndividual memberships
/products/users-group/corporateCorporate memberships
/affiliateAffiliate membership
/products/booksBooks
/products/eventsEvents
https://community.neccontract....External Subdomain Community
/products/accreditation-registerAccreditation Register
/projectsAll projects
/projects/awardsNEC Awards
/projects/tell-us-about-your-n...Tell us about your NEC project
/projects/partnering-for-succe...Partnering for Success (P4S), Sydney Water, Australia Australia’s largest water and wastewater services provider, has adopted NEC4 contracts...
/projects/nhs-nightingale-hosp...NHS Nightingale Hospital, UK NEC was used to create a 500-bed temporary hospital in just three weeks.
/why-choose-nec/how-nec-can-helpHow Contracts work
/why-choose-nec/which-nec4-con...Text duplicate Choosing the right contract
/resources/difference-between-...Differences between NEC3 and NEC4
/resources/introductory-trial-...New to NEC?
/products/training/introductio...Get started with NEC4
/resources/dictionaryDictionary of terms
/resources/insights-white-papersInsights and white papers
/resources/past-eventsPast events
/resources/amendmentsAmendments
/resources/practice-notesPractice notes
/resources/y-clausesY clauses
/resources/x29-climate-change-...X29 Climate Change
/support/contract-supportContract Resources
/support/faqs?filters=Topic_Co...Contract FAQs
/support/account-supportAccount Resources
/support/faqs?filters=Topic_Ac...Account FAQs
/support/contact-usContact us
/support/nec-for-academiaAcademia
https://www.neccontract.com/newsNews
/shopping-cartYou have 0 item(s) in your basket Shopping cart
/products/contractsBrowse contracts
/products/trainingView all
https://community.neccontract....External Subdomain Join the NEC Contracts Community
/resources/difference-between-...Explained What’s the difference between NEC3 and NEC4?
IMG-ALT NEC logo
/products/contracts/nec4/june-...NEC4: June 2017 Edition including Alliance Contract NEC4 Bundle
IMG-ALT The latest suite of NEC Contracts enable any project to be delivered on time, within budget and to the highest standards.
/products/contracts/nec4/allia...NEC4: Alliance Contract NEC4
IMG-ALT The NEC4 Alliance Contract is a multiparty contract for the appointment of a number of partners to create an alliance to deliver a major project or programme...
/products/contracts/nec4/engin...NEC4: Engineering and Construction Contract Bundle NEC4 Bundle
IMG-ALT This bundle contains everything you need to prepare, tender and manage an NEC4 Engineering and Construction Contract (ECC) and its associated NEC4 Engineerin...
/products/contracts/nec4/facil...NEC4: Facilities Management Contract NEC4
IMG-ALT The NEC4 Facilities Management Contract (FMC) is intended to be used for the appointment of a service provider for a period of time to manage and provide a f...
/products/contracts/filterText duplicate View all
https://www.neccontract.com/newsTrivial anchor text
Read more
/products/eventsUpcoming events
/projects/wits-university-fram...Text duplicate Trivial anchor text
Read more
/projects/nottingham-central-l...Text duplicate Trivial anchor text
Read more
/projects/north-district-commu...Text duplicate Trivial anchor text
Read more
/projectsText duplicate View all
/why-choose-nec/how-nec-can-helpText duplicate How Contracts work
/why-choose-nec/which-nec4-con...Text duplicate Choosing the right contract
/resources/difference-between-...Text duplicate Differences between NEC3 and NEC4
/resources/introductory-trial-...Text duplicate New to NEC?
/products/training/introductio...Text duplicate Get started with NEC4
/resources/dictionaryText duplicate Dictionary of terms
/resources/insights-white-papersText duplicate Insights and white papers
/resources/past-eventsText duplicate Past events
/resources/amendmentsText duplicate Amendments
/resources/practice-notesText duplicate Practice notes
/resources/y-clausesText duplicate Y clauses
/resources/x29-climate-change-...Text duplicate X29 Climate Change
/support/contact-usVisit our Contact us page
/support/contact-usText duplicate Contact us
/why-choose-nec/who-we-work-withWho we work with
/why-choose-nec/who-we-work-wi...Text duplicate Testimonials
/why-choose-nec/who-we-work-wi...Text duplicate Endorsements
/terms-and-conditionsTerms and Conditions
/shippingShipping
/cookie-policyCookie Policy
/site-mapSite Map
https://www.linkedin.com/compa...External Subdomain Linked in
https://www.youtube.com/user/N...External Subdomain Youtube
/privacy-policyPrivacy Policy
/copyrightCopyright
/trademark-policyTrademark Policy

Server configuration

HTTP redirects
(Critically important)
This page redirects to "https://www.neccontract.com/"
HTTP header
(Important)
No X-Powered HTTP header is sent.
This page uses GZip for compressed data transmission.
Performance
(Somewhat important)
The page response time is excellent with 0.15 seconds.
The file size of the HTML document is fine (133 kB).

HTTP Response Header

NameValue
cache-controlno-cache,no-store
pragmano-cache
content-typetext/html; charset=utf-8
content-encodinggzip
expires-1
varyAccept-Encoding
set-cookie244 Characters
strict-transport-securitymax-age=31536000
x-content-type-optionsnosniff
referrer-policystrict-origin-when-cross-origin
permissions-policyaccelerometer=(), autoplay=(), camera=(), encrypted-media=(), fullscreen=*, geolocation=(), gyroscope=(), magnetometer=(), microphone=(), midi=(), payment=(), picture-in-picture=(), usb=()
dateWed, 04 Sep 2024 11:36:09 GMT
statuscode200
http_versionHTTP/2

External factors

This website has excellent links from other websites.
This page has backlinks from 335 referring domains.
This page has 16,172 backlinks.
This page has backlinks from 293 different ip addresses.

Links from Wikipedia

No links from Wikipedia were found.

Robots.txt

User-agent: *

Allow: /

Disallow: /log-in
Disallow: /shopping-cart

User-Agent: Googlebot
Allow: .js
Allow: .css

sitemap: https://www.neccontract.com/sitemap.xml

Search preview

www.neccontract.com
Contracts, Project Management and Procurement | NEC Contracts
A family of contracts that facilitates the implementation of sound procurement and project management principles and practices as well as defining legal relationships.

Most important keywords

Following keywords were found. You can check the keyword optimization of this page for each keyword.

KeywordResultRecheck
Contract97%Check
NEC85%Check
NEC Contracts85%Check
Contracts84%Check
project70%Check
NEC Contracts Community70%Check
Alliance Contract68%Check
Project Management65%Check
NEC Users63%Check
procurement56%Check

Test up to 1.000 webpages of neccontract.com with our free plan!

Try For Free
No trial. It's just free!

Cookie Policy

We use cookies to make our site work and also for analytics and advertising purposes. You can enable or disable optional cookies as desired. See the following links for more information.

We need these so the site can function properly

So we can better understand how visitors use our website

So we can serve you tailored ads and promotions